Installation and Monitoring Results Analysis of Load Cells for Unbonded Prestressed Anchor Bundles in the Three Gorges Permanent Ship Lock
Author:
Affiliation:

(Armed Police Three Gorges Project Headquarters)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The high slopes of the Three Gorges Permanent Ship Lock are equipped with 4,367 prestressed anchor bundles, on which 101 prestressed anchor load cells have been installed, covering 91 bundles. This paper presents the installation and monitoring results of the prestressed anchor load cells, analyzes the load loss during locking and the variation patterns during operation of the prestressed anchor bundles, and evaluates the anchoring effectiveness of the installed anchor bundles.

    Reference
    Related
    Cited by
引用本文

Chen Xiaoying Installation and Monitoring Results Analysis of Load Cells for Unbonded Prestressed Anchor Bundles in the Three Gorges Permanent Ship Lock. Prestress Technology 2002,6(S05):35-39. 10.59238/j. pt. HVM2002.05.009

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 04,2026
  • Published: