Several Technical Problems in Anchorage Construction of the Three Gorges Permanent Ship Lock
Author:
Affiliation:

(Armed Police Three Gorges Project Headquarters)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The vertical-slope anchorage of the main section of the Three Gorges Permanent Ship Lock involves large quantities, complex structure, high technical difficulty, strict quality requirements, short schedule and poor construction conditions. During construction the relationship between anchorage and excavation was well handled; technical problems of hole making, hole inspection, strand threading, high-level scaffolding erection and safety management were solved, achieving good results.

    Reference
    Related
    Cited by
引用本文

Chen Xiaoying Several Technical Problems in Anchorage Construction of the Three Gorges Permanent Ship Lock. Prestress Technology 2002,6(S05):30-34. 10.59238/j. pt. HVM2002.05.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 04,2026
  • Published: