+Advanced Search 中文版
Measured Analysis of Unbonded Prestressed Concrete Lining Test Section in Sediment Sluicing Tunnel of Xiaolangdi Project
Author:
Affiliation:

(1.North China University of Water Conservancy and Electric Power; 2.CGIC Joint Venture of Yellow River Xiaolangdi Project)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The unbonded prestressed concrete lining test section of the sediment sluicing tunnel in the Xiaolangdi Multipurpose Dam Project on the Yellow River adopted the new OVM ring-anchor unbonded prestressing technology. This paper summarizes the arrangement of prestressing tendons and measuring elements in the in-tunnel test section as well as the in-tunnel unbonded prestressed concrete construction technology. Based on the full-process field measurement of the tensioning and anchoring structure of the prestressing tendons, it analyzes the variations of concrete swelling-shrinkage and thermal stress, the stress distribution law of the in-tunnel unbonded prestressed concrete lining, presents the achievements of the in-tunnel unbonded prestressed concrete lining, and proposes improvement suggestions on optimizing the concrete mix proportion and strengthening construction temperature control.

    Reference
    Related
    Cited by
引用本文

Zhao Shunbo, Li Shuyao, Jiang Ruijun Measured Analysis of Unbonded Prestressed Concrete Lining Test Section in Sediment Sluicing Tunnel of Xiaolangdi Project. Prestress Technology 2002,6(S01):17-21. 10.59238/j. pt. HVM2002.01.005

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 04,2026
  • Published: