Structural Performance Evaluation After Cracking During the Construction of Long-Span Continuous Rigid-Frame Bridges
Author:
Affiliation:

(Department of Bridge Engineering, Tongji University, Shanghai 200092, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Cracking evaluation technology during construction is crucial for evaluating the safety performance of long-span bridges and for selecting remedial measures. In this paper, by focusing on the cracking of pier cap block 0 during the construction of a continuous rigid-frame bridge in Guizhou Province and combining this information with measured data, such as crack depth, length, and position, the effects of two extreme remedial measures—complete closure after cracking and nonclosure after cracking—on the structural performance of the entire bridge are analyzed using the finite element software Midas FEA and compared with the originally designed structure without cracking. The analysis results indicate that the structural performance of the completely closed structure after cracking is basically consistent with that of the originally designed undamaged structure. Nonclosure after cracking has a significant impact on the stress distributions of the top and bottom slabs and webs near pier cap block 0, and the stress levels of these components are greater than those of the undamaged model. In this study, the most unfavorable conditions are comprehensively considered, and the influences of bridge cracks during the construction stage on the structural performance of the entire bridge are investigated. This investigation plays an important role in the safety performance evaluation after cracking during the construction of bridges, and it can serve as a practical reference for these tasks.

    Reference
    Related
    Cited by
引用本文

Jiasi Chen, Chengyue Wang, Yin Shen Structural Performance Evaluation After Cracking During the Construction of Long-Span Continuous Rigid-Frame Bridges. Prestress Technology 2024,2(01):41-55. 10.59238/j. pt.2024.01.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 05,2024
  • Revised:February 26,2024
  • Adopted:
  • Online: April 01,2024
  • Published: