(Sichuan Highway Planning, Survey, Design and Research Institute Ltd., Chengdu 610041, China)
Bo Tian, Ge Wang, Kai Wen, Ting Zhou Construction and Design of a Cable-Stayed Bridge with Concrete-Filled Steel Tube as a Main Girder. Prestress Technology 2024,2(01):27-40. 10.59238/j. pt.2024.01.003
复制