+Advanced Search 中文版
Research on Key Technologies of Prefabricated Assem-bled Construction Nodes for Shanghai Riverside Channel
Author:
Affiliation:

(1.Shanghai Chengtou Highway Investment (Group) Co., Ltd., Shanghai 200335, China;2.Shanghai Tunnel Engineering Co., Ltd., Shanghai 200032, China;3.Shanghai Urban Construction Municipal Engineering (Group) Co., Ltd., Shanghai 200032, China;4.Shanghai Swissdam Environmental Protection Technology Co., Ltd., Shanghai 200080, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In recent years, the use and promotion of prefabricated assembly construction in China have been rapidly advancing, especially when combined with prestressing technology and Ultra-High-Performance Concrete (UHPC) as a new material to solve the connection and node construction between assembly components. It has started to be widely applied in developed coastal areas of China. This paper focuses on the node connection part of the prefabricated assembly construction used in the Shanghai Riverside Channel project. It explores the application of UHPC material in the assembly process and verifies the reliability of the relevant connection nodes through various experiments. The successful application of this research has been implemented in the Shanghai Riverside Tunnel project.

    Reference
    Related
    Cited by
引用本文

Fuqiu Yin, Xiangke Chen, Yi Zhou, Xiaofeng Wang, Xiabin Yuan Research on Key Technologies of Prefabricated Assem-bled Construction Nodes for Shanghai Riverside Channel. Prestress Technology 2023,1(03):30-43. 10.59238/j. pt.2023.03.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 06,2023
  • Revised:December 15,2023
  • Adopted:
  • Online: January 16,2024
  • Published: December 25,2023