Key Technology Research on Tie Replacement of Large Span Swallow Tie Arch Bridge
Author:
Affiliation:

(1.Mianyang City Transportation Bureau,Mianyang 621000,China;2.Civil Engineering and Architecture College, Southwest University of Science and Technology,Mianyang 621000,China;3.Highway Planning Survey and Design Institute of Sichuan Provincial Communications Department,Chengdu 6100414,China;4.Mianyang Sichuanjiao Highway Planning, Survey and Design Co., Ltd,Mianyang 621000,China)

Clc Number:

U442.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Tie arch bridges were built in large numbers in China in the 1990s, and many of them have to be replaced due to serious corrosion of the ties. Ful River Bridge in Mianyang City is a (46+202+46)m swallow type bollard arch bridge, the length of the bollard anchorage section is long and the bollard cannot be replaced directly. Taking the bollard replacement project of this bridge as an example, the key technologies of structural system conversion, temporary bollard and temporary support system setting of bollard replacement project were studied, and the construction points of bollard replacement project were introduced for the reference of similar bridge projects for reinforcement and maintenance.

    Reference
    Related
    Cited by
引用本文

Xiaoxian Kang, Jiang Hu, Shien Peng, Lu Liu, Shan Jang Key Technology Research on Tie Replacement of Large Span Swallow Tie Arch Bridge. Prestress Technology 2017,21(06):15-21. 10.59238/j. pt.2017.06.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 25,2023
  • Published: