+Advanced Search 中文版
Construction plan of the main tower and cable-stayed bridge of the Beijing-Hangzhou Canal with short towers
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU217

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The low-pylon cable-stayed bridge is mainly constructed by the cable-stayed cables bearing the tension at both ends. This paper takes the prestressed concrete low-pylon cable-stayed bridge with double towers and single cable plane of Beijing-Hangzhou Bridge as the engineering background. From the construction technology of the main bridge, this paper briefly describes the construction process of the main bridge of the low-pylon cable-stayed bridge, and introduces in detail the key construction steps in the construction process of the main bridge. This paper focuses on the concrete construction process and key construction technology of the cable-stayed cable of the main tower, finally discusses the construction characteristics of the main bridge of the low-tower cable-stayed bridge and the advantages of the construction technology of the cable-stayed cable, and draws the conclusion that this technology can be popularized and applied, which provides reference and experience for the construction of the same type of bridge in the future.

    Reference
    Related
    Cited by
引用本文

Weiwei Qin, Wei Shi, Huan Lei Construction plan of the main tower and cable-stayed bridge of the Beijing-Hangzhou Canal with short towers. Prestress Technology 2017,21(06):10-14. 10.59238/j. pt.2017.06.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 25,2023
  • Published: