+Advanced Search 中文版
Research on fatigue performance of main cable of FAST project cable network
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TQ336.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to develop the main cable with high fatigue resistance that can meet the requirements of the FAST project, the fatigue performance of the main cable of the cable network was innovated, and the innovative design and improvement of the raw material, anchor structure, cable body structure and key manufacturing process were verified through the fatigue test. The experimental results confirmed that the maximum fatigue stress range of the improved and innovative main cable of the cable network could withstand could reach 50 0MPa, which meets the requirements of high fatigue resistance of FAST project.

    Reference
    Related
    Cited by
引用本文

Huan Lei, Ying Huang, Han Su, Yuan Zhu, Yaolin Wei Research on fatigue performance of main cable of FAST project cable network. Prestress Technology 2017,21(05):30-34. 10.59238/j. pt.2017.05.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 25,2023
  • Published: