+Advanced Search 中文版
Optimal design scheme of tower top gantry for suspension bridge construction
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU723.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    As one of the most important temporary facilities in the construction of suspension bridge cable system, it is very necessary to optimize the design of tower top gantry from the perspective of cost control. In this paper, the background of Tongji Bridge in Guigang City is studied. Based on the principle of technically mature and economically reasonable, the utilization rate of gantry is improved, the loss rate is reduced and the construction cost is saved by changing the connection mode of gantry and optimizing the treatment of column feet.

    Reference
    Related
    Cited by
引用本文

Dan Yu, Futang Wei, Ke Gan, Mian Luo Optimal design scheme of tower top gantry for suspension bridge construction. Prestress Technology 2016,20(01):28-32. 10.59238/j. pt.2016.01.005

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: