+Advanced Search 中文版
Discussion on the application of reinforcement system of arch bridge suspender
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U445.72

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In recent years, with the increasing traffic volume and traffic load, the force of the original boom cannot meet the requirements of the original design, and more and more maintenance of the boom of arch bridge, such as replacing the boom, will not only bring damage to the bridge itself, but also cause traffic congestion. Based on the practical application of Chengdu Ring-cheng high-speed Fuhe Bridge, this paper introduces the reinforcement system of the bridge and the existing problems in the design and construction, and puts forward suggestions on the existing problems to provide reference for the reinforcement design and construction of similar Bridges in the future.

    Reference
    Related
    Cited by
引用本文

Wei Shi, Jianping Hua, Guokun Zheng, Hande Wang, Huan Lei Discussion on the application of reinforcement system of arch bridge suspender. Prestress Technology 2014,18(05):3-18. 10.59238/j. pt.2014.05.001

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: