A brief discussion on the construction technology of replacing hollow slab beam support by synchronous jacking with bullleg method
Author:
Affiliation:

(Liuzhou Overwem Engineering Co., LTD. Liuzhou 545005)

Clc Number:

TU753.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combined with engineering examples, this paper mainly introduces the use of PLC synchronous intelligent jacking system, the use of its "industrial computer + programmable controller + hydraulic control system" to form a distributed control system, to achieve displacement control synchronization, cyclic jacking, until the jacking height reaches the design requirements, to replace the support construction. This method effectively solves the problem that there is no direct lifting space between the beam bottom and the cover beam, and provides reference and experience for the construction of similar Bridges in the future.

    Reference
    Related
    Cited by
引用本文

Junzhi Zeng, Futang Wei, Shitao Zhu A brief discussion on the construction technology of replacing hollow slab beam support by synchronous jacking with bullleg method. Prestress Technology 2014,18(04):33-36. 10.59238/j. pt.2014.04.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: