The steel strand hoist system is the key structure in the process of the suspension boom replacement of intermediate arch bridge. Taking the derrick replacement project of Hezhou Bridge in Hezhou City as an example, this paper introduces the structural design and checking calculation method of the steel strand hoist system, and expounds the application technology of the steel strand hoist system, so as to provide reference for similar projects.
Reference
Related
Cited by
引用本文
Xiaoyong Wang Design and application of steel strand hoist system in replacing arch bridge boom. Prestress Technology 2014,18(04):14-17. 10.59238/j. pt.2014.04.003