(Liuzhou Overwem Engineering Co., LTD. Liuzhou 545005)
U448.35
Fei Shen, Dehong Liao, Weijian Li, Dandan Zhou Single cable plane cable-stayed bridge combined hanging basket cantilever pouring construction. Prestress Technology 2014,18(02):28-32. 10.59238/j. pt.2014.02.006
复制