+Advanced Search 中文版
Single cable plane cable-stayed bridge combined hanging basket cantilever pouring construction
Author:
Affiliation:

(Liuzhou Overwem Engineering Co., LTD. Liuzhou 545005)

Clc Number:

U448.35

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Chongqing Double Monument Jialingjiang Bridge, with a main span of 330 meters, is a high-low tower single-cable plane double-row cable-stayed bridge, the main beam is cantilevered construction, the section is 7 meters long and weighs about 460t. This paper introduces the application of composite hanging basket cantilever casting and steel strand group anchor cable-stayed cable construction in the construction of this bridge.

    Reference
    Related
    Cited by
引用本文

Fei Shen, Dehong Liao, Weijian Li, Dandan Zhou Single cable plane cable-stayed bridge combined hanging basket cantilever pouring construction. Prestress Technology 2014,18(02):28-32. 10.59238/j. pt.2014.02.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: