+Advanced Search 中文版
Research on construction control of prestressed tensioned string floor
Author:
Affiliation:

(Beijing Institute of Construction Engineering Co., LTD., Beijing 100039, China)

Clc Number:

TU378.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The concreting of long span string beam is a new structure form, but the construction control of string beam is always a difficult problem in the construction field. In this paper, the key technologies in the construction process are studied, the accurate analysis model is established, the out-of-plane instability of the string beam is analyzed, and the displacement control and cable force control methods in the construction process are proposed.

    Reference
    Related
    Cited by
引用本文

Youheng Duan, Feng Wang, Zeqiang Wang, Deqing You, Dong Zhang Research on construction control of prestressed tensioned string floor. Prestress Technology 2014,18(01):27-30. 10.59238/j. pt.2014.01.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 08,2023
  • Published: