The application of prestressing technology in the project of Ningbo Bund Bridge
Author:
Affiliation:

(Shanghai Municipal Engineering Design and Research Institute (Group) Co., LTD., Shanghai 200092, China)

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Ningbo Bund Bridge adopts a special cable-stayed bridge structure with a single tower and four cable planes with a main span of 225m, and the approach bridge adopts a prestressed concrete continuous beam structure. This paper focuses on the application of prestressed engineering technology of the main bridge of the Bund Bridge, such as the cable-stay and anchorage system, the post-anchor prestressing and suspension anchorage system, the steel-concrete connection node of the tower pier, the design of the prestressed concrete continuous box girder of the approach bridge, and the prestressed tension control during the construction of the tower rotation, which has certain reference value for similar projects.

    Reference
    Related
    Cited by
引用本文

Junjie Zhang, Biao Ma The application of prestressing technology in the project of Ningbo Bund Bridge. Prestress Technology 2013,17(06):11-31. 10.59238/j. pt.2013.06.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: