(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)
TU435
Renqing Li, Lixia Liang Installation and construction technology of post-tensioning circumferential prestressing system for tunnel lining of South-to-North Water diversion project. Prestress Technology 2013,17(05):21-28. 10.59238/j. pt.2013.05.005
复制