+Advanced Search 中文版
Construction technology of boom replacement for Yongning Pu Miao Bridge
Author:
Affiliation:

(Liuzhou Overwem Engineering Co., LTD. Liuzhou 545005)

Clc Number:

TU753.3

  • Article
  • | |
  • Metrics
  • |
  • Reference [2]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    This paper introduces the new combined extrusion cable structure and its application in Pumiao Bridge, and the construction method of the whole bridge boom replacement. Through the use of mobile hoist system, the replacement construction of boom is safer and more convenient, and the construction speed is significantly improved. This law is the first of its kind in China.

    Reference
    [1]黄颖,朱万旭,杨帆.钢绞线整束挤压式拉索锚具抗滑性能的试验研究[J]. 预应力技术,2008(6):9-11
    [2]孙剑飞,韦福堂,谭俊冬.南阁大桥临时索锚箱设计及斜拉索更换施工[J]. 建筑施工2010(10)95-96.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
引用本文

Baocheng Xiang, Fenglin Zhang, Xiaofen Lu, Ling Yang Construction technology of boom replacement for Yongning Pu Miao Bridge. Prestress Technology 2013,17(02):29-33. 10.59238/j.pt.2013.02.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: August 06,2023