+Advanced Search 中文版
Installation and construction technology of the cable-stayed cable of Jialingjiang Bridge in Chongqing
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU984.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking Jialingjiang Bridge of Chongqing Shuangbi as an example, the construction technology of parallel steel strand cable-stayed cable and the complex construction technology of single cable tension combined with front fulcrum hanging basket are introduced.

    Reference
    Related
    Cited by
引用本文

Dehong Liao, Zhaohui Huang Installation and construction technology of the cable-stayed cable of Jialingjiang Bridge in Chongqing. Prestress Technology 2013,17(01):32-36. 10.59238/j. pt.2013.01.005

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: