Liuzhou Shuangyong Bridge cable system transformation
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U448.213

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Liuzhou Shuangyong Bridge spans the Liujiang River. The main bridge is a three-span continuous steel box girder suspension bridge with a single main cable gravity anchorage suspension cable structure. The main bridge is constructed by means of the main cable erection and the box girder pushing synchronously, and the system conversion is realized by the derrick tension. The unique main bridge structure and novel construction procedures add highlights to the construction process of the bridge.

    Reference
    Related
    Cited by
引用本文

Xiaofen Lu, Fenlin Zhan, Ke Gan, Baocheng Xiang Liuzhou Shuangyong Bridge cable system transformation. Prestress Technology 2012,16(04):25-28. 10.59238/j. pt.2012.04.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: