The Huxi Bridge in Liuzhou has caused some diseases due to long-term overload operation. In order to ensure the operation safety of the bridge, it is decided to replace the cable of the bridge. The replacement cable adopts parallel wire cable, and the supporting anchor is cold cast anchor. This paper mainly introduces the cable replacement construction technology and construction technology of Huxi Bridge.
Reference
Related
Cited by
引用本文
Hui Cen, Hai Zeng, Renan Lei Cable replacement construction of Huxi Bridge in Liuzhou. Prestress Technology 2012,16(04):21-24. 10.59238/j. pt.2012.04.005