+Advanced Search 中文版
Construction technology of the cable-stayed cable of Tongfu Road Grand Canal Bridge in Huaian
Author:
Affiliation:

(Liuzhou City Administrative Law Enforcement Bureau Liudong Branch, Liuzhou 545616)

Clc Number:

TU753.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Tongfulu Grand Canal Bridge is a two-tower, two-cable-plane prestressed concrete partial cable-stayed bridge with prestressed concrete main beams and a variable height single-box four-room vertical web section. This paper mainly introduces the construction technology of the cable-stayed cable of Tongfu Grand Canal Bridge in Huaian, and understands the construction characteristics, construction methods and key points of the cable-stayed bridge with low tower, hoping to provide reference for similar cable-stayed bridge projects.

    Reference
    Related
    Cited by
引用本文

Xiaolei Li, Yan Zhao Construction technology of the cable-stayed cable of Tongfu Road Grand Canal Bridge in Huaian. Prestress Technology 2012,16(03):35-39. 10.59238/j. pt.2012.03.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: