+Advanced Search 中文版
Construction of upper suspension structure of LEINLI suspension bridge in Myanmar
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU974

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
引用本文

Feng Zhang, Shuangrong Li, Qiguang Yang Construction of upper suspension structure of LEINLI suspension bridge in Myanmar. Prestress Technology 2012,16(02):35-38. 10.59238/j. pt.2012.02.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: