(Yiwu Polytechnic of Industry and Commerce, Yiwu 322000, China)
Clc Number:
TU757
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This paper introduces the key points of quality control in the prestressed construction of 48+80+48m continuous beams on pier 8 ~ 11 of Tokyo Temple Bridge, from the embedding of pipes, the arrangement of prestressed reinforcement bars to the application of prestressed stress.
Reference
Related
Cited by
引用本文
Jiming Li, Yangguo Fu Quality control of prestressed continuous beams of Tokyo Temple Bridge. Prestress Technology 2012,16(1):28-37. 10.59238/j. pt.2012.01.008