(Guangdong Academy of Building Science, Guangzhou 510400, China)
Clc Number:
U456.33
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The basic principle of TSP system and ground penetrating radar in tunnel advance geological prediction is introduced. The application of TSP system and ground penetrating radar in a tunnel of Xiashen-Shenzhen Railway is taken as an example to further verify the accuracy of the comprehensive detection technology in tunnel geological prediction.
Reference
Related
Cited by
引用本文
Weiyuan Tan Application of tunnel integrated geological advance prediction technology. Prestress Technology 2012,16(1):21-24. 10.59238/j. pt.2012.01.006