+Advanced Search 中文版
Reinforcement and derrick replacement of the old bridge of Guiping Qianjiang Bridge in Guangxi
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U445.72

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper mainly introduces the replacement construction of the old derrick of Guiping Qianjiang Bridge and the design and application of the special structure of the derrick. This project is to replace the old header wire of φ5 with an OVM.250 clip anchorage and GJ steel strand whole bundle extruding combined derrick. This scheme is the first time in the design of the two different anchoring methods combined, and used in the old bridge cable replacement. According to the particularity of the structure, the design idea and the special construction method of the derrick are introduced.

    Reference
    Related
    Cited by
引用本文

Yuan Zhu, Fan Yang, Zhenrui Mo, Tao Liang Reinforcement and derrick replacement of the old bridge of Guiping Qianjiang Bridge in Guangxi. Prestress Technology 2012,16(1):14-16. 10.59238/j. pt.2012.01.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: