+Advanced Search 中文版
Overall design of cable-stayed bridge for main channel bridge of Donghai Bridge
Author:
Affiliation:

(China Railway Bridge Survey and Design Institute Co., LTD., Wuhan, Hubei 430050)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main channel bridge of Donghai Bridge is a five-span continuous two-tower central cable plane cable-stayed bridge with a main span of 420m. The main beam is the steel-concrete box combination beam first used in the long-span cable-stayed bridge. The overall design of the bridge is introduced.

    Reference
    Related
    Cited by
引用本文

Zongyu Gao Overall design of cable-stayed bridge for main channel bridge of Donghai Bridge. Prestress Technology 2011,15(02):3-19. 10.59238/j. pt.2011.02.001

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 06,2023
  • Published: