Abstract:Taking the reinforcement project of Yongjiang Bridge in Nanning City as the background, this paper introduces the construction scheme and technical characteristics of LSD hydraulic lifting system applied to the integral large displacement lifting of hanging beam. The engineering practice shows that it has the advantages of synchronous control, high degree of automation, flexible construction, and can improve the efficiency and safety reliability of engineering construction