Conception and Design of Approach Bridge of Hangzhou Bay Bridge
Author:
Affiliation:

(China Railway Bridge Survey and Design Institute Co., Ltd., Wuhan 430050,china)

Clc Number:

U443.82

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction conditions of the Hangzhou Bay Bridge are complex and the project scale is huge. The approach bridge accounts for about 95% of the total length of the bridge. The superstructure of the approach bridge in the offshore and mudflat areas adopts 70m and 50m span prefabricated box girders, and the whole span is prefabricated and erected. Steel pipe Pile foundation and precast piers are mostly used for the substructure of the approach bridge. Introduce the natural environment of the bridge site, design principles for cross sea long bridges, and the concept and comparison of approach bridge schemes

    Reference
    Related
    Cited by
引用本文

Huang Yanqing, Wang Donghui, Zhang Yanfei Conception and Design of Approach Bridge of Hangzhou Bay Bridge. Prestress Technology 2010,14(05):7-10. 10.59238/j. pt.2010.05.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 08,2023
  • Published: