+Advanced Search 中文版
Design of Temporary Cable Anchor Box and Replacement Construction of Stay Cable for Nange Bridge
Author:
Affiliation:

(Liuzhou OVM Engineering Co., Ltd.,Liuzhou 545005,china)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Nange Bridge is a reinforced concrete prefabricated cable-stayed bridge. During the process of replacing the stay cables, a temporary cable support system is used to assist in the replacement construction of the stay cables. Due to the special structure of the main bridge, the temporary cables are connected to the main bridge structure using the principle of friction transmission force, and the friction type anchor box is designed. The anchor box system adopts a fully welded structure in the form of a hoop structure. During the replacement of the stay cables, a graded and multiple system transformations are used, Control based on the principle of basic invariance of elevation and displacement

    Reference
    Related
    Cited by
引用本文

Sun Jianfei, Wei Futang, Tan Jundong Design of Temporary Cable Anchor Box and Replacement Construction of Stay Cable for Nange Bridge. Prestress Technology 2010,14(04):33-35. 10.59238/j. pt.2010.04.009

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 08,2023
  • Published: