+Advanced Search 中文版
Inspection Standard for Splitting Pipe of Saddle on a Low Tower Cable-stayed Bridge Tower in Beijing
Author:
Affiliation:

(BMEDI BEIJING GENERAL MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE CO., LTD.,Beijing 100082,China )

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The low tower cable-stayed bridge is a new type of bridge both domestically and internationally, and there is currently no inspection standard for the wire separation pipe of the saddle at the tower column. This article combines the construction of a low tower cable-stayed bridge in Beijing to discuss the background of the production of inspection standards for the branch pipes of the bridge, provide specific inspection standards for the branch pipes of the bridge, and provide detailed explanations for each standard

    Reference
    Related
    Cited by
引用本文

Xu Debiao, Hui Bin Inspection Standard for Splitting Pipe of Saddle on a Low Tower Cable-stayed Bridge Tower in Beijing. Prestress Technology 2010,14(04):13-15. 10.59238/j. pt.2010.04.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 08,2023
  • Published: