(Liuzhou OVM Machinery Co., Ltd.,Liuzhou 545006,china )
U455.4
Zhang Riliang, Gan Ke, Zhang Feng, Wei Dewang Construction of the Cable System for the TUTI Bridge in the Republic of Sudan. Prestress Technology 2009,13(03):17-20. 10.59238/j. pt.2009.03.004
复制