+Advanced Search 中文版
Design of Nanning Bridge and Its Tied Steering Gear
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd.,Liuzhou 545006,china )

Clc Number:

U463.43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article introduces the world's first large-span curved bridge with an asymmetric cambered arch bridge and its tie rods, and a linear elastic channel steering gear is designed and applied to this bridge. The linear elastic channel steering gear is placed at the tangent of the cable arc, and the deviation formed by the cable at the steering gear is very small. Reasonable steering can be achieved through the elastic deformation of the channel, relying on the elastic compression deformation of the channel wall to form an appropriate curved line shape

    Reference
    Related
    Cited by
引用本文

Huang Ri, Jin Long, Liao Qian, Yang Qiguang, Deng Nianchun, Wang Riyi Design of Nanning Bridge and Its Tied Steering Gear. Prestress Technology 2009,13(03):13-16. 10.59238/j. pt.2009.03.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: