+Advanced Search 中文版
Construction Technology of Stay Cables for Sanmenjiang Bridge in Liuzhou
Author:
Affiliation:

(China TIESIJU Civil Engineering Group Co., Ltd.,Hefei 230023)

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Sanmenjiang River Bridge in Liuzhou is a prestressed concrete Box girder bridge bridge with double towers, double cable planes and three spans. This article introduces the system structure, overall construction plan, construction method, cable force monitoring method, construction technology, and construction points of the main bridge cable-stayed cable, and provides a detailed description of the precautions during the construction of the cable-stayed cable.

    Reference
    Related
    Cited by
引用本文

Hu Yong Construction Technology of Stay Cables for Sanmenjiang Bridge in Liuzhou. Prestress Technology 2009,13(02):20-22. 10.59238/j. pt.2009.02.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: