+Advanced Search 中文版
Bridge Construction Control Technology (2)
Author:
Affiliation:

(Shanghai Foundation Engineering Group Co., Ltd.,Shanghai 200002,china)

Clc Number:

U448.35

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The core task of construction control is to analyze, identify, adjust various errors, and predict the future state of the structure. Continuous beam bridges, continuous T-structures, and cable-stayed bridges with hanging holes are not as easy to adjust as cable-stayed bridges, and can only be adjusted by formwork elevation and prestressed tendons. Therefore, it is necessary to ensure the achievement of control objectives

    Reference
    Related
    Cited by
引用本文

Qiu Shizhong Bridge Construction Control Technology (2). Prestress Technology 2009,13(01):28-34. 10.59238/j. pt.2009.01.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: