Discussion on Quality Pre control of Concrete Bored Pile Supervision
Author:
Affiliation:

(Shandong Tianzhu Construction Supervision Consulting Co., Ltd)

Clc Number:

TU473.11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on practical experience, this article summarizes the quality problems that are prone to occur during the construction of concrete bored piles, and proposes measures for pre control during the supervision process.