Abstract:
Taking the construction practice of box girder in Sihui West Interchange Ramp Bridge Project of G55 Erenhot–Guangzhou Expressway as an example, this paper introduces the characteristics of cast-in-place construction technology of prestressed continuous box girder of ramp bridge from the aspects of support engineering, formwork engineering, reinforcement engineering, concrete engineering and prestressed engineering