Abstract:The Caohe Aqueduct is a large intersecting building in the middle line of the South to North Water Diversion Project, and ensuring the safety of the building in design is crucial. By optimizing the structure of the aqueduct body, the body was changed from unidirectional prestressing to three-dimensional prestressing, which improved the crack resistance of the structure and saved engineering quantity and investment