+Advanced Search 中文版
Dongshen Water Supply Renovation Project φ Finite Element Simulation Analysis of 4.8-meter Large Unbonded Prestressed Culvert Pipe
Author:
Affiliation:

(Guangdong Provincial Institute of Water Resources and Electric Power Survey, Design and Research)

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article combines the structural design of large unbonded prestressed culvert pipes in the Dongshen Water Supply Renovation Project, and conducts stress analysis and research on two types of prestressed anchoring schemes: ring anchor and counter anchor using three-dimensional finite element technology. The main analysis is to analyze the prestressed loss and prestressed effect under the two schemes, and comprehensively consider factors such as construction to establish a reasonable prestressed anchoring scheme, providing a basis for design

    Reference
    Related
    Cited by
引用本文

Yan Zhenrui, Zhu Fangmin Dongshen Water Supply Renovation Project φ Finite Element Simulation Analysis of 4.8-meter Large Unbonded Prestressed Culvert Pipe. Prestress Technology 2008,12(02):3-5. 10.59238/j. pt.2008.02.001

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: