+Advanced Search 中文版
Design of Humin Elevated Road Phase II Project
Author:
Affiliation:

Clc Number:

U412.373.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It mainly introduces the design technical standards of the project, the characteristics of the design scheme of the major traffic junction, the major improvements made in the architectural design of urban viaducts, and the prefabricated segmental assembly construction technology of the bridge erecting machine adopted for the first time in the construction of urban viaducts in China.

    Reference
    Related
    Cited by
引用本文

Chen Qisu, Liu Xiaoping Design of Humin Elevated Road Phase II Project. Prestress Technology 2007,11(06):12-15. 10.59238/j. pt.2007.06.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: