+Advanced Search 中文版
Application of slow bonding prestressed concrete technology in Tianjin Lishen Battery Expansion Project
Author:
Affiliation:

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the application of slow-bonded prestressing technology in the expansion project of Tianjin Lishen Battery. It focuses on the design calculation of slow-bonded prestressed reinforced concrete and the deployment and tensioning of slow-bonded prestressing tendons, and also describes the advantages of this technology.

    Reference
    Related
    Cited by
引用本文

Yu Huimin, Wang Zhongzhu, Jia Xijun, Zou Anyu Application of slow bonding prestressed concrete technology in Tianjin Lishen Battery Expansion Project. Prestress Technology 2007,11(05):29-33. 10.59238/j. pt.2007.05.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: