Numerical Calculation and Principles in Tunnel Engineering Monitoring Process
Author:
Affiliation:

(1.China Railway Tunnel Group Second Division Co., Ltd;2. China Railway Tunnel Survey and Design Institute Co., Ltd;)

Clc Number:

TU196

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Numerical calculation in the process of subway monitoring is an important link in the monitoring and measurement technology, which directly affects the quality and reliability of the monitoring results. This paper synthesizes the situation of tunnel construction monitoring in some areas, and comprehensively introduces the calculation methods and principles of tunnel displacement allocation, commonly observed physical quantities, monitoring of adjacent underground pipelines, and monitoring of differential settlement of ground buildings in the process of tunnel engineering monitoring, which can be used as a reference for the counterparts.

    Reference
    Related
    Cited by
引用本文

Zhang Aiping, Zhang Xiangduo Numerical Calculation and Principles in Tunnel Engineering Monitoring Process. Prestress Technology 2007,11(05):3-7. 10.59238/j. pt.2007.05.001

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: