Construction Technology of Bidirectional Pull Steel Box Concealed Excavation
Author:
Affiliation:

Clc Number:

TU753.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The comprehensive pipe trench of the main road of Chenggong in Kunming City is from Kunming city to Chenggong New District, and the pipe trench passes diagonally through the Kunyu Highway, which has a busy traffic. In order to ensure the normal operation of the Kunyu Highway during the construction period, the project for the first time adopted a two-way tensile steel box culvert pipe trench, under the Kunyu Highway through the new construction technology.

    Reference
    Related
    Cited by
引用本文

Qin Cube, Sun Yifeng, Li Dongping, Wang Xiaolong Construction Technology of Bidirectional Pull Steel Box Concealed Excavation. Prestress Technology 2006,10(06):32-33. 10.59238/j. pt.2006.06.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: