+Advanced Search 中文版
Design of Beipan River Bridge on Shuibai Railway
Author:
Affiliation:

Clc Number:

U448.13

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Beipanjiang Bridge of Shuibai Railway is a top-loading steel-tube concrete arch bridge with a span of 236m, and the weight of single-hinged plane transporter used in the construction reaches 104,000kN.This paper introduces the structural design of the main bridge and the transporter construction method used in the main bridge.

    Reference
    Related
    Cited by
引用本文

Ma Tinglin, Xu Yong, He Tingguo, Chen Kejian, Guo Jianxun, Li Huijun Design of Beipan River Bridge on Shuibai Railway. Prestress Technology 2006,10(06):10-14. 10.59238/j. pt.2006.06.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: