+Advanced Search 中文版
Cable force optimization construction of stay cables of South Taihu Bridge
Author:
Affiliation:

Clc Number:

TU457

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduces the optimized construction of cable-stayed cable adjustment of South Taihu Lake Bridge. Through the optimization of the cable-stayed bridge construction process at various stages and under different working conditions, the cable-stayed cable force and the final cable force at the time of constant load of the bridge are optimized to ensure the reasonable structural stress and construction safety, so that the structural stress after the bridge is completed and the whole bridge line is more reasonable.

    Reference
    Related
    Cited by
引用本文

Shen Fei, Li Zhaoliang Cable force optimization construction of stay cables of South Taihu Bridge. Prestress Technology 2006,10(04):29-31. 10.59238/j. pt.2006.04.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: