Abstract:The paper introduces the optimized construction of cable-stayed cable adjustment of South Taihu Lake Bridge. Through the optimization of the cable-stayed bridge construction process at various stages and under different working conditions, the cable-stayed cable force and the final cable force at the time of constant load of the bridge are optimized to ensure the reasonable structural stress and construction safety, so that the structural stress after the bridge is completed and the whole bridge line is more reasonable.