+Advanced Search 中文版
Hydraulic lifting installation construction of the crossbeam of Guiyang Guanshan Bridge
Author:
Affiliation:

(Liuzhou Ouweim Engineering Co., Ltd; Liuzhou No. 2 Construction Engineering Company)

Clc Number:

TU758.11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper mainly introduces the process and technical points of ZLD automatic continuous hydraulic lifting system in Guiyang Guanshan Bridge beam lifting construction.

    Reference
    Related
    Cited by
引用本文

He Guoming, Zhu Tingzhi, Tang Ronglin Hydraulic lifting installation construction of the crossbeam of Guiyang Guanshan Bridge. Prestress Technology 2006,10(04):25-28. 10.59238/j. pt.2006.04.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: