(Liuzhou Ouweim Engineering Co., Ltd; Liuzhou No. 2 Construction Engineering Company)
TU758.11
He Guoming, Zhu Tingzhi, Tang Ronglin Hydraulic lifting installation construction of the crossbeam of Guiyang Guanshan Bridge. Prestress Technology 2006,10(04):25-28. 10.59238/j. pt.2006.04.006
复制