+Advanced Search 中文版
Production and installation of tie rods and cables for Nanchang Shengmi Bridge
Author:
Affiliation:

Clc Number:

U443.38

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the engineering characteristics of Nanchang Shengmi Bridge and the structure and use of parallel steel wire cable, this paper describes the production, transportation, installation, tensioning and other construction processes of the special tether cable of the Shengmi Bridge, which is of certain reference value for the design and construction of similar extracorporeal prestressing projects.

    Reference
    Related
    Cited by
引用本文

Li Hongtao, Li Yahui Production and installation of tie rods and cables for Nanchang Shengmi Bridge. Prestress Technology 2006,10(03):30-33. 10.59238/j. pt.2006.03.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: