Abstract:There are some difficulties in the construction of large tonnage anchor holes in the complex stratum of high slopes. This paper introduces a combination of submerged hammer and pipe drilling and bottom reaming construction method, which can be used to drill larger anchor holes with lighter drilling rigs.