+Advanced Search 中文版
Research and application of the cable system for OVMAT low tower cable-stayed bridge
Author:
Affiliation:

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the development process of OVMAT cable-stayed short tower cable-stayed bridge by taking Fujian Zhangzhou Battle Reserve Bridge and Lanzhou Xiaoxihu Yellow River Bridge as examples. The split-wire technology is used to solve the deficiencies of the original cable-stay system saddle and anti-slip anchors, and the optimized design of the beam-end anchorage is combined with the characteristics of the short tower cable-stayed bridges, and the corrosion and water-proofing of the cable-stayed bridges are well solved.

    Reference
    Related
    Cited by
引用本文

Lee Wenxian, Zhao Jingzhao, Song Qiang, Wei Zhuangke Research and application of the cable system for OVMAT low tower cable-stayed bridge. Prestress Technology 2006,10(01):33-35. 10.59238/j. pt.2006.01.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: